Answer:
Step-by-step explanation:
6x^2+5x+1=0
Descr= b^2-4ac
Descr= 25-24=1
X1= (-b+√descr)/2a = (-5+1)/12= -1/3
X2= (-b-√descr)/2a = (-5-1)/12= -1/2
Is that all the information ? I think they’re missing something
Answer:
Multiply g by 23 to get
the missing value in the last row is 92.
A real-world situation that is represented in the table is “Rio’s car gets 23 miles per gallon.”.
or A,D,E
Answer:
15 days
Step-by-step explanation:
Let x be the number of days needed for B to complete the job. Then x-5 is the number of days needed for A to complete the job.
In 1 day,
- A completes
of all work; - B completes
of all work.
Hence, in 1 day both A and B complete
of all work. A and B working together can do a work in 6 days. Then

Solve this equation:

If
then
that is impossible. So, B needs 15 days to complete the work alone.