Answer:
Step-by-step explanation:
First, convert the 4 mins into hours by dividing by 60;
4/60 =0.067
Add 0.067 to 75 hrs to get the total = 75+0.067 = 75.067
Therefore the total time Chris needs to make up for is 75.067 hrs
Total number of days Chris has = 25
Next,
IF in 25 days = he can cover 75.067hrs
then in 1 day he will cover = (1 * 75.067)/ 25
= 3.002
Therefore, Chris needs to do 3hrs each day to be able to complete the deadline
1 ton is 2,000 lbs
9 x 2,000 = 18,000
So, 18,000 is equal to 9 tons.
Hope this helps. :)
Please find the attached diagram for a better understanding of the question.
As we can see from the diagram,
RQ = 21 feet = height of the hill
PQ = 57 feet = Distance between you and the base of the hill
SR= h=height of the statue
=Angle subtended by the statue to where you are standing.
= which is unknown.
Let us begin solving now. The first step is to find the angle
which can be found by using the following trigonometric ratio in
:

Which gives
to be:

Now, we know that
and
can be added to give us the complete angle
in the right triangle
.
We can again use the tan trigonometric ratio in
to solve for the height of the statue, h.
This can be done as:





Thus, the height of the statue is approximately, 8.45 feet.
The first problem, all you need to do is combine like terms then isolate the n:
4n-2n=4
~subtract 2n from 4n (2n)
2n=4
~then divide both sides of the equation by 2 to isolate the n
n=4
The second problem follows the same steps of combining like terms and isolating the variable. Here, you'll have to combine 2 like terms:
-12=2+5v+2v
~first combine the variables which is just 5v+2v which is 7v
-12=2+7v
~then subtract 2 from both sides to isolate the 7v
-14=7v
~then divide both sides by 7 to isolate the v and get your answer
-2=v
Hope that helped!
Answer:
probably d sorry i couldnt alot