Answer:
Options (A), (B), (C), and (D)
Explanation:
The volcanic activity refers to the eruption of magma at the surface of the ocean floor and continental land areas, forming volcanoes.
Some of the tectonic settings that are associated with volcanic activity are as follows-
- Mantle plumes- These are the large uprising bodies of magma that are generated due to the formation of convection current in the mantle. These are localized body and are located away from the tectonic boundaries. For example, Hawaii is formed as the plates moved over the mantle plumes.
- Continental rifts- This refers to the eruption of magma at the surface of the continents, due to the divergent motion of two continental plates. It results in the formation of a rift, rift valley and then later forms an ocean.
- Island arcs- These are formed due to the collision of two oceanic plates, where the volcanoes are formed on the lighter oceanic plate due to the rising up of magma.
- Continental arcs- These are formed due to the collision between an oceanic and a continental plate, where the volcanoes are formed due to the uprising of magma in the lighter continental plates.
Answer: more likely to obtain a graduate degree
Explanation:
The data are qualitative because they don't measure or count anything
4 men x 8 days = 32 days work content & 6 women x 8 days = 48 work content
6 women at 1/400 per day x 8 days is 48/400. 352+ so 1 mans daily output is 11 work units per day x 4 men = 44 work output per day x 8 days = 352 total work output
3 men x 10 days = 30 days work content & 7 women x 10 days = 70 work content
1 man work output is 11 x 3 men x 10 days = 333 work units
one woman’s work output is 1/400 per day x 7 women = 7/400 per day x 10 days = Total of 70 work output plus men’s output of 330 = 400 work units.
10 women x 40 days = 400 work content
so if 10 men carried out the work its 11 x 10 men = 110 work units per day
400 work units + 110 work units per day = 3.6363 days work for 10 men.
1 women daily work output = 1/400 unit per person x 10 women or 10/400 work units per day so 10 x 40 days
4 Men & 6 Women = 8 days (men = 4 x 8 x 11 = 352)( 6 x 8 x 1/40 = 48/40
3 Men & 7 Women=10 days (men = 3 x 10 x 11 = 330)(7 x 10 x 1/40 =70/40)
10 women at 1/400 each per day x 40 days is 400 work units
while 10 men x 11 units is 110 units per day so for 400 units it’s 3.6363 days
1 man is equal approximately to 11 Women
10 men can do job in 3.6363 days x ratio of 11 =
Answer: It will taken 10 women x 40 days to complete the same job.
Sea floor leveling.
Hope this helped, have a great day! :D