Answer:
<u>18</u>
Step-by-step explanation:
You basically have to do 13.5 divided by 0.75 (3/4) which equals 18
He worked 36 hours (9.57), and anything over that was over pay (14.36)
36 * 9.57 = 344.52
So, working his normal hours he got $344.52.
416.32 - 344.52 = 71.80
71.80/14.36 = 5
Therefore, he worked 5 hours of overtime.
First, you want to identify the slopes and y-int.
Equation 1 = y = -2x + 2
Slope = -2
y-int. = 2 or (0,2)
Equationt 2 = y = 2x + 3
Slope = 2
Y-int. = 3 or (0,3)
To graph, first plot the y-intercepts. Then do the slopes.
Slope = -2
Down 2 over 1 (to the right)
Slope = 2
Up 2 over 1 (to the right)
Then just connect the dots in a line!

the idea being, you multiply the "x" by some power of 10 that moves the repeating part to the left of the decimal point and the split it like above.
The probability that the sum of the dice is 7 is 1/2 because there are only three combinations that result in the sum of 7: (1,6)(2,5) and (3,4). But there are 6 possible outcomes( this is if you don’t add reverse combinations such as 1,6 and 6,1) so the probability would be 3/6 or 1/2