Answer:
The guaranteed mileage should be 31800 miles.
Step-by-step explanation:
Consider the provided information.
It is given that the normally distributed with a mean of 40,000 miles and a standard deviation of 4,000 miles. Also the company desires that no more than 2 percent of the tires will fail to meet the guaranteed mileage.
That means the p < 0.02
Now with the help of the table the respective Z-score value of p < 0.02 is -2.05
From the provided information mean and standard deviation is given as 
Now use the formula: 
Substitute the respective values in the above formula.




Hence, the guaranteed mileage should be 31800 miles.
(2,13),(5,22)
slope = (22 - 13) / (5 - 2) = 9/3 = 3
y = mx + b
slope(m) = 3
use either of ur points...(2,13)...x = 2 and y = 13
now sub and find b, the y int
13 = 3(2) + b
13 = 6 + b
13 - 6 = b
7 = b
so ur equation is : y = 3x + 7 <===
Answer:
b. 300x1 + 125x2 < = 4,000
Step-by-step explanation:
Maximum of 4,000 hours
This means that the the total amount of labor has to be of at most 4,000, that is:

300 ping-pong balls (x1) or 125 wiffle balls (x2) can be produced per hour of labor
The total amount of labor is:

Uniting the two equations:


And thus the correct answer is given by option b.