Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.
8*4
I hope that helps !
So, 4*4*4*4 = 16+16 which is 32
Answer:
5
Step-by-step explanation:
In order to solve this problem, we need to use Pythagorem Theorem (a^2+b^2=c^2)
When using the pythagorem theorem the hypoteneuse would be the c^2 and the two other sides would be a and b (the order doesn't matter).
So, our formula would be:
4^2+3^2=c^2
Simplifies into:
25=c^2
In order to remove the exponent 2, we would have to square root both sides by 2. After doing so, you get the answer 5.
Hope this helps! :)
So if you're driving 25 miles per hour, it would take you 7 hours to drive 175 miles.
175 miles ÷ 25 miles = 7 hours.