Answer:
$7803.72
Step-by-step explanation:
We have been given that a silo is in the shape of a cone. The silo is 8 meters tall and it's base has a diameter of 3 meters. Soybeans cost $414 per cubic meter. We are asked to find the total cost to fill the silo with soybeans.
First of all, we will find the volume of silo using volume of cone formula.
, where,
r = radius
h = Height
We know that radius is half the diameter, so radius of silo would be
.





Now we will multiply total volume by $414 to find total cost.\



Therefore, it will cost $7803.72 to fill the silo with soybeans.
X would equal 81 because the square root of 81 is 9.
9 x 9 = 81
Multiply the first equation by 2 to then use elimination by adding the 2 equations.
So, 14x-2y=14
+. x+2y=6
Equals 15x=20 so x=20/15=4/3
Plug in to first equation to get y
7(4/3)-y=7
28/3-y=7
28/3-y=21/3
So y=7/3
Plug both x and y into second equation to check
4/3+2(7/3)=
4/3+14/3=18/3=6 it works
So x=4/3, y=7/3
Hope this helps! Have a blessed day!
Answer:
I believe it would be 376.65 for flooring for a 4.5x3.6 large room
It’s easier if you turn the fractions into decimals and arrange them in order from biggest to smallest. 3/4= 0.75, 5/6= 0.83, 7/9= 0.77, 1/2= 0.5, 2/3= 0.66, 7/12= .583, 15/24= 0.625. Then obviously, you order them from biggest to smallest:
0.83 (5/6), 0.77 (7/9), 0.75 (3/4), 0.66 (2/3), 0.583 (7/12), 0.5 (1/2).