Answer and explanation:
Since a quarter(1/4) of paint covers 80 square feet, a whole paint would cover 80×4= 320 square feet of the wall
Remaining part of the wall left unpainted after using one whole paint
480-320= 160 square feet
Therefore paint required for remaining unpainted part
= 160/80= 2 quarters of paint(1/4+1/4)= 1/2 paint
Total paint required for the wall = one whole paint + half paint = 1+1/2= 1 1/2
Total paint required is one and half
Or
We divide area of wall by area of wall covered by each quarter
480/80=6 quarters of paint
6 quarters of paint = 1/4+1/4+1/4+1/4+1/4+1/4
We still get same answer
= 1 1/2
BC= 39
Explanation:
4z+4z+3z+3+3z+3=174
8z+6z+6=174
14z+6=174
Subtract 6 from both sides
14z=168
Z=12
So then 3*12+3=39
And you can check by doing 39+39+48+48
And it equals 174
Well knowing that it’s 5 1/4 and the cost of paint is 13.99, I’m going to assume to multiply by the given product which is 13.99 by one quarter (which is 25)
If I'm understanding the question correctly, 7+3=10. 10*8=80.
Answer:

Step-by-step explanation:
Given that a shuttle launch depends on three key devices that may fail independently of each other with probabilities 0.01, 0.02, and 0.02, respectively.
Required probability = the probability for the shuttle to be launched on time
= Probability that all three do not fail
Since each key device is independent of the other
we have
prob that all three do not fail = 