<em><u>Answer</u></em>
5 hours
<em><u>Explanation</u></em>
The two working together can finish a job in

Also, working alone, one machine would take one hour longer than the other to complete the same job.
Let the slower machine working alone take x hours. Then the faster machine takes x-1 hours to complete the same task working alone.
Their combined rate in terms of x is

This should be equal to 20/9 hours.

Multiply through by;





Factor to get:


It is not feasible for the slower machine to complete the work alone in 4/9 hours if the two will finish in 20/9 hours.
Therefore the slower finish in 5 hours.
in the control board type:
HKEY_CURRENT_USER\Control Panel\Accessibility\Keyboard Response\BounceTime
Answer:
Option a electronic switch used on FPDs
Explanation:
A thin film transistor (TFT) is an electronic switch which is commonly used in a liquid crystal display (LCD). TFT derives its name by the way how it is produced. It is produced by layering thin films of semiconductor. TFT is a type of transistor which is used to control state every individual pixel in a LCD. TCT can change the states of pixels (on and off) very quickly.
Hoi!
I would say DeviantArt, since that is the world's largest social website dedicated to displaying artwork.