yo sup??
The number can't be a probability of an event cause probability of an even lied between 0 and 1 whereas the number given to use is -0.25.
Since probability can't be negative therefore it isn't a probability of an event.
Hope this helps.
Answer:
1/6*6
Step-by-step explanation:
Answer:
The standard deviation of number of hours worked per week for these workers is 3.91.
Step-by-step explanation:
Problems of normally distributed samples can be solved using the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by
After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X. Subtracting 1 by the pvalue, we This p-value is the probability that the value of the measure is greater than X.
In this problem we have that:
The average number of hours worked per week is 43.4, so .
Suppose 12% of these workers work more than 48 hours. Based on this percentage, what is the standard deviation of number of hours worked per week for these workers.
This means that the Z score of has a pvalue of 0.88. This is Z between 1.17 and 1.18. So we use .
The standard deviation of number of hours worked per week for these workers is 3.91.
5.3 minutes.
First, let's calculate the volume of the tank. That will be the area of the base multiplied by it's length. And since it's base is a circle, the area is pi*r^2. So:
V = l*pi*r^2
V = 3.5 * pi * (2.2/2)^2
V = 3.5 * pi * (1.1)^2
V = 3.5 * pi * 1.21
V = 4.235 * pi
V = 13.30464489
So the tank has a volume of about 13.3 ft^3. Now simply divide that volume
by the rate of incoming fluid. So
13.3 / 2.5 = 5.32
Rounding to 2 significant figures gives a time of 5.3 minutes.
Here is your answer:
Your answers Graph A.
Reason: That's because the given line starts on the quarter by 1 which equals .25 and goes up to 6.
You're answer is A.