1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iVinArrow [24]
3 years ago
14

In Full Screen Reading View, which area is reduced?

Computers and Technology
1 answer:
REY [17]3 years ago
6 0

Go to options .

  • Suppose you are reading a document .
  • You want to read in full screen .
  • Hence the Go-to bar will be reduced .
You might be interested in
W-11/6=4<br><img src="https://tex.z-dn.net/?f=%20%20%5Cfrac%7Bx%20-%2011%20%7D%7B%206%7D%20%20%3D%204" id="TexFormula1" title="
kozerog [31]

step 1, multiply by 6:

x-11 = 4*6 = 24

step 2, add 11:

x = 35

7 0
3 years ago
350 square feet requires 1 gallon of paint. Assign gallons_paint with the amount of paint required for wall_area. Sample output
Marina CMI [18]
Here's a solution in node.js. Can be easily transcribed to other languages:

var paint_per_sqf = 1/350;
var wall_area = 250.0;
var gallons_paint = wall_area * paint_per_sqf;

console.log(wall_area.toFixed(1) + " square feet wall will need:");
console.log(gallons_paint.toFixed(12) + " gallons of paint");


4 0
3 years ago
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
Are u a chicken nugget!!??
creativ13 [48]
Yes. Yes I would classify myself as the nugget of the chicken thank you for asking me. 
3 0
3 years ago
Read 2 more answers
What kind of a computer language could PROGRAM A be referred as?
Svetlanka [38]

Answer:

A programming language is a vocabulary and set of grammatical rules for instructing a computer or computing device to perform specific tasks. The term programming language usually refers to high-level languages, such as BASIC, C, C++, COBOL, Java, FORTRAN, Ada, and Pascal.

4 0
4 years ago
Other questions:
  • How is a network printer identified on the network?
    8·1 answer
  • In Outlook 2016, what are the three format options when sending an email message? Check all that apply.
    7·1 answer
  • A network administrator receives a call from the sales department requesting ports 20 and 21 be opened on the company’s firewall
    12·1 answer
  • Which of the following is not true about designing classes? In order for class information to be printed instead of a memory add
    12·1 answer
  • Insert a function in cell g5 to calculate the first student's monthly payment, using appropriate relative and absolute cell refe
    13·1 answer
  • Calculate the change in RGDP if the MPC is .6 and initial spending is $500,000.
    8·1 answer
  • Fill in each blank with the correct step from the fetch-execute cycle.
    14·1 answer
  • Only for study<br><br>Or open Meet and enter this code: bqa-ivfs-ach​
    11·2 answers
  • Which of the following does Secure Sockets Layer (SSL) use to authenticate a user or system before encrypting a session?
    14·1 answer
  • Please help with this question
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!