Given BD and AC is a diameter of the circle:
We need to find the following:
1. measure of the arc BA
So,
the measure of the minor arc BA = 44
The measure of the major arc BA = 360 - 44 = 316
2. the measure of the arc ACB = 360 - 44 = 316
3. The arc BCD is a semicircle of the circle
So, the measure of the arc BCD = 180
Answer:
The probability that exactly one switch is good is

Step-by-step explanation:
The probability that a switch is defective is:

The probability that a switch is not defective is

Therefore, if two switches are selected, the probability that exactly 1 is good is:



Slope function
Hope this will help!
Answer:
The sampling method applied is Cluster sampling.
Step-by-step explanation:
A cluster sampling method is the type of sampling where first the entire population is divided into homogeneous groups. Then a random sample of these groups are selected.
After selecting a sample of groups, a random sample of fixed size is selected from each group.
In this case all freshmen are first divided into 30 sections, then 4 random sections are selected and the students in those 4 sections are sampled.
The sampling method applied is Cluster sampling.