1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
nalin [4]
2 years ago
8

A collection of cells with similar function forms-

Social Studies
1 answer:
Kruka [31]2 years ago
3 0

Answer:

the correct answer is B. tissue

You might be interested in
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Olivia is punished for spilling her cereal. Her parents give her a spanking and send her to her room where she cries. Later, her
vagabundo [1.1K]

Answer:

C.

Explanation:

In the given case, Olivia's behavior towards her puppy was modeled based on the behavior of her parents towards her.

The behavioral theory, or the operant theory, suggests that rewards or punishment for a person is based on his/her behavior. <u>In the above mentioned case, Olivia is punished for spilling her cereal by her parents. Being a child, Olivia, through this scenario learned that a wrong act should be punished. And this behavior of her parents, she applied on her puppy who made a mess on the floor by kicking the puppy and putting it in the yard</u>.

So, the correct answer is option C.

6 0
3 years ago
Read 2 more answers
what did william bradford's quote "as one small candle may light a thousand, so the light here kindle hath shone unto many, yea,
IRISSAK [1]
As in the power to believing , if a few believe our nation could succeed , it's possible
 
having hope and believing is the theme
4 0
3 years ago
Read 2 more answers
Pumpkins can be orange, white, green, or what other color?
miss Akunina [59]
Pumpkins can be green yellow white red blue
so basically they can also be blue and yellow
7 0
3 years ago
Read 2 more answers
Compare the tactics used by the French troops in the French and Indian war with those of the American patriots during the revolu
Degger [83]

Answer:

The French and Indian War began in 1754 as a conflict between British and French colonists in North America. French forces and their allies relied on guerrilla tactics to fight the colonists, notes "The War That Made America," TV series website. ... Guerrilla warfare is particularly effective for forces that are outnumbered

Explanation:

3 0
3 years ago
Other questions:
  • Eduardo is in the fourth grade. Part of the instruction in his classroom is conducted in English and part is conducted in Spanis
    6·1 answer
  • What is the lowest job for low asvab scores?
    15·1 answer
  • How did the search for a western water route affect europe and the americas?
    6·1 answer
  • Someone who needs a vehicle to travel to work,run daily errands, and make yearly road trips would most likely choose to do which
    15·2 answers
  • The argument from experience basically argues what? we are determined because we know from experience that there are causes for
    9·1 answer
  • Please 50 point if you answer all this questions please help!!!!!!!!!!!!!!!!!<br> hurry
    7·1 answer
  • Which of the following most accurately describes Ainsworth’s strange situation test used to measure children’s attachment? The c
    6·1 answer
  • Helping u breathe is not a main function of the breathing system ​
    8·2 answers
  • PLEASE HELP THIS ASSEMENT IS DUE RIGHT NOW
    14·1 answer
  • PLZ ANSWER THIS CORRECTLY THERE ARE EXTRA POINTS AND WILL MARK BRAINLY
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!