Vice City (XXXTENTACION)
0:13━❍──────── -3:41
↻ ⊲ Ⅱ ⊳ ↺
VOLUME: ▁▂▃▄▅▆▇ ∞
The answer is above
Trust
Answer:
Based on the model produced by the scatterplot, log of stock prices is calculated from the scatter plot and 10 is raised to the power of the result to obtain the estimated stock price. Hence, a reasonable estimate for the stock price would be ; $185.05
From the scatter plot model :
Week number, x = 95
log y = 0.0022(95) + 2.0583
log y = 2.2673
y = estimated stock price
Raise the power of both sides to the power of 10
Therefore, a reasonble estimate for the stock price would be $185.05
ANSWER = C
Answer: So you are going to make an equation first.
Step-by-step explanation:
first we know that for the first 2 hours the snow fell at an inch an hour. so we are going to make our first plots ( I suggest using an online site like geogebra or desmos to start out with before plotting for your assingment)
our first plot is going to be at (1,1) or 1 over and 1 up. remember points are in the form of (x,y). then (2,2)
Now we see that it has changed now there is no new snow for 6 hours so you are going to have a flat line so its going to be (2,2) then its going to continue that way as (3,2),(4,2), (5,2) (6,2)(7,2)(8,2).
It starts snowing again and now we have a new thing to plot the snow is falling at a constant of 3 inches an hour for the next 5 hours so now we are going to plot hte points to get our points we are going add 3 inches to our current inches each new hour. so its going to be (9,(2+3)) which is (9,5) and continue on doing that so we will have the plots (10,8) (11,11) (12,14) (13,17). and now we connect our plots by creating segments so then you do that on your thing and youre set to go I hope this helps.
Answer:
640 cm³
Step-by-step explanation:
V = 1/3Bh
So...
1/3(32)(60)
= 640 cm³
Two words. The input and the output determine this