1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Katen [24]
2 years ago
5

How can you divide 3 4 by 65

Mathematics
2 answers:
ira [324]2 years ago
5 0

Answer:

0.52307692307

Step-by-step explanation:

The number 34 is called the numerator or dividend, and the number 65 is called the denominator or divisor.

The quotient of 34 and 65, the ratio of 34 and 65, as well as the fraction of 34 and 65 all mean (almost) the same:

34 divided by 65, often written as 34/65.

Aleks04 [339]2 years ago
3 0

Answer:

48 3/4

Step-by-step explanation:

65/1

3 x65/4x1=195/4 which equal 48 3/4

You might be interested in
Pre-Calculus question:
zhuklara [117]
You already have figured the main idea. In this case, the population is growing 1.9% a year. This word can be translated into: multiplied by 101.9% (100+1.9%). That means the P0 is 6 bill, the base is 101.9%(or 1.019) and the time is 50 years. The calculation would be:
<span>P(t)=P₀a^t
</span>P(t)=6 billion * 101.9%^50= 6 billion * <span>2.56276= 15.38 billion</span><span>

</span>
5 0
3 years ago
If I had 3000 pennies and my mom took away 1000 pennies how many are left
pishuonlain [190]

Subtract 3000-1000

took away means subtracting

left means how many are remaining

3000-1000= 2000

Answer:

2000 pennies

7 0
3 years ago
Read 2 more answers
Many, many snails have a one-mile race, and the time it takes for them to finish is approximately normally distributed with mean
Mamont248 [21]

Answer:

a) The percentage of snails that take more than 60 hours to finish is 4.75%.

b) The relative frequency of snails that take less than 60 hours to finish is 95.25%.

c) The proportion of snails that take between 60 and 67 hours to finish is 4.52%.

d) 0% probability that a randomly-chosen snail will take more than 76 hours to finish

e) To be among the 10% fastest snails, a snail must finish in at most 42.32 hours.

f) The most typical 80% of snails take between 42.32 and 57.68 hours to finish.

Step-by-step explanation:

Problems of normally distributed samples are solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

In this problem, we have that:

\mu = 50, \sigma = 6

a. The percentage of snails that take more than 60 hours to finish is

This is 1 subtracted by the pvalue of Z when X = 60.

Z = \frac{X - \mu}{\sigma}

Z = \frac{60 - 50}{6}

Z = 1.67

Z = 1.67 has a pvalue 0.9525

1 - 0.9525 = 0.0475

The percentage of snails that take more than 60 hours to finish is 4.75%.

b. The relative frequency of snails that take less than 60 hours to finish is

This is the pvalue of Z when X = 60.

Z = \frac{X - \mu}{\sigma}

Z = \frac{60 - 50}{6}

Z = 1.67

Z = 1.67 has a pvalue 0.9525

The relative frequency of snails that take less than 60 hours to finish is 95.25%.

c. The proportion of snails that take between 60 and 67 hours to finish is

This is the pvalue of Z when X = 67 subtracted by the pvalue of Z when X = 60.

X = 67

Z = \frac{X - \mu}{\sigma}

Z = \frac{67 - 50}{6}

Z = 2.83

Z = 2.83 has a pvalue 0.9977

X = 60

Z = \frac{X - \mu}{\sigma}

Z = \frac{60 - 50}{6}

Z = 1.67

Z = 1.67 has a pvalue 0.9525

0.9977 - 0.9525 = 0.0452

The proportion of snails that take between 60 and 67 hours to finish is 4.52%.

d. The probability that a randomly-chosen snail will take more than 76 hours to finish (to four decimal places)

This is 1 subtracted by the pvalue of Z when X = 76.

Z = \frac{X - \mu}{\sigma}

Z = \frac{76 - 50}{6}

Z = 4.33

Z = 4.33 has a pvalue of 1

1 - 1 = 0

0% probability that a randomly-chosen snail will take more than 76 hours to finish

e. To be among the 10% fastest snails, a snail must finish in at most hours.

At most the 10th percentile, which is the value of X when Z has a pvalue of 0.1. So it is X when Z = -1.28.

Z = \frac{X - \mu}{\sigma}

-1.28 = \frac{X - 50}{6}

X - 50 = -1.28*6

X = 42.32

To be among the 10% fastest snails, a snail must finish in at most 42.32 hours.

f. The most typical 80% of snails take between and hours to finish.

From the 50 - 80/2 = 10th percentile to the 50 + 80/2 = 90th percentile.

10th percentile

value of X when Z has a pvalue of 0.1. So X when Z = -1.28.

Z = \frac{X - \mu}{\sigma}

-1.28 = \frac{X - 50}{6}

X - 50 = -1.28*6

X = 42.32

90th percentile.

value of X when Z has a pvalue of 0.9. So X when Z = 1.28

Z = \frac{X - \mu}{\sigma}

1.28 = \frac{X - 50}{6}

X - 50 = 1.28*6

X = 57.68

The most typical 80% of snails take between 42.32 and 57.68 hours to finish.

5 0
3 years ago
Find the angle between u = (8.- 3) and v = (-3,- 8) Round to the nearest tenth of a degree.
Nimfa-mama [501]

Answer:

<h2>90°</h2>

Step-by-step explanation:

First you must calculate the module or the magnitude of both vectors

The module of u is:

|u|=\sqrt{(8)^2 + (-3)^2} \\\\|u|=\sqrt{64 + 9}\\\\|u|=8.544

The module of v is:

|v|=\sqrt{(-3)^2 + (-8)^2} \\\\|u|=\sqrt{9 + 64}\\\\|u|=8.544

Now we calculate the scalar product between both vectors

u*v = 8*(-3) + (-3)*(-8)\\\\u*v = -24+ 24=0

Finally we know that the scalar product of two vectors is equal to:

u*v = |u||v|*cos(\theta)

Where \theta is the angle between the vectors u and v. Now we solve the equation for \theta

0 = 8.544*8.544*cos(\theta)\\\\0 = cos(\theta)\\\\\theta= arcos(0)\\\\\theta=90\°

the answer is 90°

Whenever the scalar product of two vectors is equals to zero it means that the angle between them is 90 °

5 0
3 years ago
Read 2 more answers
what is the least number that can be made using each digit exactly once? explain why the value of the 4 is greater than the valu
MAXImum [283]
The value of four is not greater than five of corse if the value of four were positive and five negative but four is not greater the five.
8 0
3 years ago
Other questions:
  • What is the arc measure of AD in degrees?
    9·1 answer
  • What is the value of a in the equation 3 a plus b equals 54 when b equals 9?
    9·2 answers
  • Number 6: Which is closer to 0.0009999? 0, 1/2, or 1?
    5·1 answer
  • Solve the following inequality
    13·1 answer
  • Which equation represents the average of the x-intercepts for 4x^2-24x+20
    5·1 answer
  • Using right triangle below find the sine of angle B
    10·2 answers
  • 55 minutes to 4 hours write the ratio as a fraction in lowest terms answer
    8·1 answer
  • Y=5x+1 graph the equation
    12·2 answers
  • Which expression has the largest value each has 9/16 as the factor
    6·1 answer
  • You have the cards numbered 1-10 in front of you.Each time you select a card,it is returned.What is the probability of selecting
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!