Answer:
Step-by-step explanation:
12P3 = 12! / (12-3)!
= 12*11*10
= 1320.
8C7 = 8!/7! *(8-7)!
= 8.
Your answer would be choice 3, because when all points of a line lie in a plane, the plain contains the line so the line can contain all of the points. Hope this helped. ;)
7 weeks = 7 x 7 = 49 days.
March has 31 days so from March 30 to March 31: 1 day
April has 30 days.
31 days already
49 - 31 = 18
so May 18 is the most accurate due date
It is not because always remember, a positive is greater than a negative. This equation is showing a negative being greater than a positive. That's like saying I'm taller than you.
Answer:
10.5
Step-by-step explanation:
b=15/tan(55 degrees)=10.5
AC=10.5