1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Eddi Din [679]
3 years ago
10

Plz help!! I will give most brainliest!! No links plz!!!

Mathematics
1 answer:
pochemuha3 years ago
5 0

Answer: May 20th

Step-by-step explanation: Using basic math to decide that 3x5 is 15 and 5x3 is 15, you can see that after 5 diving lessons and 3 swimming lessons, Bridget will have both again in 15 days time.

You might be interested in
In a process that manufactures bearings, 90% of the bearings meet a thickness specification. A shipment contains 500 bearings. A
Marina86 [1]

Answer:

(a) 0.94

(b) 0.20

(c) 90.53%

Step-by-step explanation:

From a population (Bernoulli population), 90% of the bearings meet a thickness specification, let p_1 be the probability that a bearing meets the specification.

So, p_1=0.9

Sample size, n_1=500, is large.

Let X represent the number of acceptable bearing.

Convert this to a normal distribution,

Mean: \mu_1=n_1p_1=500\times0.9=450

Variance: \sigma_1^2=n_1p_1(1-p_1)=500\times0.9\times0.1=45

\Rightarrow \sigma_1 =\sqrt{45}=6.71

(a) A shipment is acceptable if at least 440 of the 500 bearings meet the specification.

So, X\geq 440.

Here, 440 is included, so, by using the continuity correction, take x=439.5 to compute z score for the normal distribution.

z=\frac{x-\mu}{\sigma}=\frac{339.5-450}{6.71}=-1.56.

So, the probability that a given shipment is acceptable is

P(z\geq-1.56)=\int_{-1.56}^{\infty}\frac{1}{\sqrt{2\pi}}e^{\frac{-z^2}{2}}=0.94062

Hence,  the probability that a given shipment is acceptable is 0.94.

(b) We have the probability of acceptability of one shipment 0.94, which is same for each shipment, so here the number of shipments is a Binomial population.

Denote the probability od acceptance of a shipment by p_2.

p_2=0.94

The total number of shipment, i.e sample size, n_2= 300

Here, the sample size is sufficiently large to approximate it as a normal distribution, for which mean, \mu_2, and variance, \sigma_2^2.

Mean: \mu_2=n_2p_2=300\times0.94=282

Variance: \sigma_2^2=n_2p_2(1-p_2)=300\times0.94(1-0.94)=16.92

\Rightarrow \sigma_2=\sqrt(16.92}=4.11.

In this case, X>285, so, by using the continuity correction, take x=285.5 to compute z score for the normal distribution.

z=\frac{x-\mu}{\sigma}=\frac{285.5-282}{4.11}=0.85.

So, the probability that a given shipment is acceptable is

P(z\geq0.85)=\int_{0.85}^{\infty}\frac{1}{\sqrt{2\pi}}e^{\frac{-z^2}{2}=0.1977

Hence,  the probability that a given shipment is acceptable is 0.20.

(c) For the acceptance of 99% shipment of in the total shipment of 300 (sample size).

The area right to the z-score=0.99

and the area left to the z-score is 1-0.99=0.001.

For this value, the value of z-score is -3.09 (from the z-score table)

Let, \alpha be the required probability of acceptance of one shipment.

So,

-3.09=\frac{285.5-300\alpha}{\sqrt{300 \alpha(1-\alpha)}}

On solving

\alpha= 0.977896

Again, the probability of acceptance of one shipment, \alpha, depends on the probability of meeting the thickness specification of one bearing.

For this case,

The area right to the z-score=0.97790

and the area left to the z-score is 1-0.97790=0.0221.

The value of z-score is -2.01 (from the z-score table)

Let p be the probability that one bearing meets the specification. So

-2.01=\frac{439.5-500  p}{\sqrt{500 p(1-p)}}

On solving

p=0.9053

Hence, 90.53% of the bearings meet a thickness specification so that 99% of the shipments are acceptable.

8 0
3 years ago
Explain how you can how do you rename 5400 as hundreds
umka2103 [35]
I think it is fifty-four hundred
8 0
3 years ago
What is the slope of the graph of 4 x + 8 y = 11?
Karolina [17]

Answer:

B  -1/2

Step-by-step explanation:

4x+8y = 11

We need to get the equation in the slope intercept form

y = mx+b  where m is the slope and b is the y intercept

Subtract 4x from each side

4x-4x+8y = -4x+11

8y = -4x+11

Divide by 8

8y/8 = -4x/8 +11/8

y = -1/2x +11/8

The slope is -1/2 and the y intercept is 11/8

8 0
3 years ago
Read 2 more answers
Will give brainliest answer
densk [106]

Answer:

d =13 cm

r = 6.5 cm

Step-by-step explanation:

The diameter is the distance across the circle, going through the center

d = 13 cm

The radius is 1/2 of the diameter

r = d/2 = 13/2 = 6.5 cm

4 0
3 years ago
Read 2 more answers
55x - 21a ..............
RoseWind [281]
What is the question?

8 0
4 years ago
Other questions:
  • Using the Two-Transversal proportionality Corollary, what is the approximate value of JK?
    14·1 answer
  • Mary says the pen for her horse is an acute right triangle is this possible
    7·1 answer
  • -20 ? I’m a little confused on the “2x” part
    11·1 answer
  • Evaluate the following expression <br> 20/ 2 + 8
    13·1 answer
  • Solve for x. x2 = 64
    5·2 answers
  • 3 consecutive odd integers have the sum of 35 find the largest integer
    13·1 answer
  • Help, what are the next three numbers??
    14·2 answers
  • please help me(i need a quick answer) Jackie is training for a marathon. Today she is running 2 1/2 kilometers. She took a rest
    14·1 answer
  • A right triangle has a leg of 15 feet and a second leg of 24 feet. Find the length of the hypotenuse
    14·1 answer
  • Divide!<br><br> 2/5 divided by 1 4/5
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!