Solve 5+8 and get 13(3+x) then muliply 13×3 and 13×X... you will end up with 39+13x
What is the task and how many hours does it take?
Answer:
A function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Step-by-step explanation:
Work done to lift the rope by distance x feet:

Work done to lift the bucket by distance x feet:

On reaching top 7 gallons of water spilled out so , on going up by x feet
gallons of water spilled out.
a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground:

Now the work to get the bucket to the top of the cliff i.e. x =35

W=3726
Hence, a function that gives the work required in foot-lbs to lift the bucket up x feet from the ground is
and the work to get the bucket to the top of the cliff is 3726 foot-lbs
Answer:
I thinks its SAS
Step-by-step explanation:
SAS is Two sides and included agale of one triangle congruent to two sides
Answer:
you need diffrent ones child
Step-by-step explanation: