1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
slamgirl [31]
3 years ago
10

Determine whether the sequence is geometric.if it is geometric,find the common ratio r​

Mathematics
1 answer:
Temka [501]3 years ago
3 0

Answer: r = 2

Step-by-step explanation:

You might be interested in
Find the perimeter of a triangle with sides 12 inches, 9 inches, and 15 inches.
Artist 52 [7]
If its perimeter, it should be quite easy to find. Just add 12+9+15. Which equals 36. So the perimeter is 36 inches. -Hope it helps!
7 0
3 years ago
Read 2 more answers
A submarine sandwich 1.5feet long is cut into 0.25 foot pieces. how many pieces will there be?
MA_775_DIABLO [31]
There would be 6 pieces.
6 0
3 years ago
Read 2 more answers
If the measure of an angle is 78 less than the measure of its compliment, what is the measure of the angle?
aliina [53]
Complementary angles add up to 90'
So let X= angle 1
         Y=angle 2
So x+y=90
let x=y-78
so(y-78)+y=90
y-78+y=90
2y-78=90
2y=90+78
2y=168
y=168/2
y=84
x=y-78
so x=84-78
x=6
And 6+84=90
So the measure of the angle is 6 degrees.
Hope i helped!


6 0
3 years ago
Read 2 more answers
What is the mean, median, mode, and range of this data set, 2,3,2,4,3,3,3,4,2,3,4,2,4,4,9,3,4,4
slava [35]

Answer:

Mean: 3.5

Median: 3

Mode: 4

Range: 7

Step-by-step explanation:

5 0
3 years ago
Read 2 more answers
I WILL MARK BRAINLIEST A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to buil
Alona [7]

Using a system of equations, it is found that since 20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.

<h3>What is a system of equations?</h3>

A system of equations is when two or more variables are related, and equations are built to find the values of each variable.

In this problem, the variables are:

  • Variable c: number of child bikes.
  • Variable a: number of adult bikes.

Each child bike requires 4 hours to build, as do each adult bike. The company has 100 hours of testing, hence:

4c + 4a = 100.

c + a = 25.

With 20 child bikes and 6 adult bikes in a week, we have that c = 20, a = 26, hence:

c + a = 26

20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.

More can be learned about a system of equations at brainly.com/question/24342899

#SPJ1

4 0
1 year ago
Other questions:
  • A pile of sand is in the shape of a right circular cone. The height of the cone is 10 feet and the radius of the circular bottom
    9·1 answer
  • 7,000 mg = how many grams
    12·1 answer
  • Top soil is sold by the cubic yard. How much top soil, to the nearest cubic yard, is needed to create a flower bed with soil 4 f
    15·1 answer
  • The profit from the lemonade sale can be modeled by P = c - 25. How many cups need to be sold make a profit of $40?
    10·1 answer
  • What is sqrt 6/5 in it's simplest radical form?
    8·1 answer
  • What is the value of 3(y+4)-(x-1) when x=3 and Y=2
    7·2 answers
  • A person rides a bike from home to a restaurant, eats a meal, and then rides home.
    9·1 answer
  • 3) A tour trolley covers a distance of 8.5 miles in of an hour.
    11·1 answer
  • Alexis bought x boxes of cereal for $3 each, including tax, and paid with a $20 bill. Which expression represents the total amou
    5·2 answers
  • I need some help to classify this triangle pls
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!