Finance and Administration
The Finance and Administration Section Chief of the Incident Command System is split into four units:
1. Time Unit
Responsibility: Time recording of personnel
2. Procurement Unit
Responsibility: Contracts of Equipment rental supply
3. Compensation/ Claims Unit
Responsibility: Claims, Records, Compensation of workers
4. Cost Unit
Responsibility: Estimates collections. Monitor incident cost
Answer: <em>The texture of soil determines soil water-holding capacity, permeability, and soil workability. Sand, silt, clay, and organic matter particles in a soil combine with one another to form larger particles. Soil structure is the arrangement of the soil particles into aggregates of various sizes and shapes. THEREFORE THE ANSWER TO THE FIRST ONE IS A) SOIL TEXTURE. </em>
<em />
<em />
<em>FOR THE SECOND QUESTION THE ANSWER IS B) CRUMBY.</em>
<em />
<em>FOR THE THIRD QUESTION THE ANSWER IS D) Water carries nutrients below plant roots where they are unavailable to plants.</em>
<em />
<em>FOR THE FOURTH QUESTION THE ANSWER IS D) Soil pH does not affect the availability of nutrients</em>
<em />
<em />
<em>FOR THE FIFTH QUESTION THE ANSWER IS C) Soil which contains relatively equivalent portions of sand, silt and clay</em>
Explanation: Good luck you got this!!! :))
Protective systems are methods of protecting workers from cave-ins of material that can fall or roll into an excavation, or from the collapse of nearby structures. As mentioned in earlier chapters, if an excavation is less than 5 feet deep, OSHA does not require a protective systems unless the competent person sees signs of a potential cave-in. (It is important to remember that a wall collapse in a trench four and 1/2 feet deep can still have serious results!) For trenches between 5 feet and 20 feet deep, shoring and sheeting, shielding, sloping and benching are all acceptable protective measures. It is up to the planners of the construction project and the competent person on site to determine which systems will work best. If an excavation is greater than 20 feet deep, a registered professional engineer must design the protective system.
Shoring systems are structures of timber, mechanical, or hydraulic systems that support the sides of an excavation and which are designed to prevent cave-ins.Sheeting is a type of shoring system that keeps the earth in position. It can be driven into the ground or work in conjunction with a shoring system. Driven sheeting is most frequently used for excavations open for long periods of time. Another type of sheeting, in which plates or shoring grade plywood (sometimes called Finland form) is used in conjunction with strutted systems such as hydraulic or timber shoring. These strutted systems are also referred to as active systems. The most frequently used strutted system involves aluminum hydraulic shoreswhich are lightweight, re-usable and installed and removed completely from above
Answer:
Affinity
Explanation:
If you want an audience that aligns with your product, you must choose the affinity method. This method picks up preferences of people through online browsing and then segregates people with similar interests and makes sure they are presented with content they might be interested in.
For example google uses this same strategy to find out peoples interests and then showing them what they want to see.
Answer:
Ocean tides are caused by the complex interplay of three astronomical bodies