if we take 20 to be the 100%, what is 13 off of it in percentage?
The constant term is the term that does not have a variable (a letter).
In this case 8 is your answer, for it does not have a variable attached to it.
~
Answer: the answer is b, thank me later
Answer:
The false statement is "it can be used for one variables at a time"
Step-by-step explanation:
Given:
Simulation for NPV.
To Find :
Which statements is not correct .
Solution;
In simulation NPVs, Net present values.
<em>In Excel the simulation called as monte carlo simulation</em>
So it consists of variables like mean ,standard deviation, variance etc.
In simulation it develops the graphs .
It consists of formula for probability calculation
So it has probability distribution function.
Ultimately, It will develop the output values for input variables.
Hence The false statement will be that" it can only be used for one variable at a time"
This is your perfect answer