1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Andrews [41]
3 years ago
7

You buy a sandwich for ​$3.85​, an apple for ​$0.​05, and a bottle of juice for ​$1.15. What is the total​ cost?

Mathematics
2 answers:
dem82 [27]3 years ago
8 0

Answer:

5.05$

Step-by-step explanation:

3241004551 [841]3 years ago
5 0

Answer:

5.05

Step-by-step explanation:

3.85+0.05+1.15

= $5.05

You might be interested in
Finding the expression
ser-zykov [4K]
That can also be written as 1/6y^5
7 0
3 years ago
The number of people who attended a concert on Friday was 34 the number of people who attended the same concert on Saturday. A t
PilotLPTM [1.2K]

Answer:

8

the answer is 806

Step-by-step explanation:

840-36=806

6 0
3 years ago
How do I solve this I don't understand it
Free_Kalibri [48]
Here’s how u do it ^

7 0
3 years ago
Graph the line y-5=3/2(x+1)​
Vitek1552 [10]

slope: 3/2

y-intercept: 13/2

7 0
3 years ago
An assembly line produces 2 toasters per minute. It is 2:00pm and the line has finished 560 out of its goal of 900 for the day.
LenaWriter [7]

Answer:

I won't stop the line for a half hour break.

Step-by-step explanation:

<u>Proportions</u>

One quantity A is said to be proportional to other B if A can always be obtained by multiplying or dividing B by any constant number. Numbers {4,8,12} are proportional to {2,4,6} because they can be computed as twice their value

.

There is a situation described in the problem where we need to know if there will be enough time to produce the 900 toasters (the goal for the day) when the assembly line is stopped by half an hour.

Actual time: 2:00 pm

Final time: 5:00 pm

Rate of production: 2 toasters/minute

Actual production: 560 toasters

Updated goal: 900-560 = 340 toasters  

Those 340 toasters must be produced in the remaining 3 hours (180 minutes) of work. If the assembly line stops for half an hour (30 minutes), there will be only 150 minutes to finish the goal production. At a rate of 2 toasters/minute, there will be 2*150 = 300 toasters produced. But we need to produce 340 more toasters, so that break cannot be granted or we'll be 40 toasters under goal.

It the line keeps producing for 180 minutes, it would produce 2*180 = 360 toasters, 20 more than the goal.

Note: The maximum break time that can be granted is 20/2 = 10 minutes

4 0
3 years ago
Other questions:
  • Given f(x)=3/4x and f(x) = 75 solve for x
    6·1 answer
  • Lowest term of 14/20
    5·2 answers
  • Solve this equation please −5×(−2)=?
    13·2 answers
  • WILL GIVE BRAINLIEST HURRY
    6·1 answer
  • Select the inequality below that is one of the two inequalities used to solve: |3+2x|&lt;11
    10·1 answer
  • Select the expression that is equivalent to (picture)
    9·1 answer
  • It’s problem #2<br><br> Write an equation for the line in the slope-intercept form.
    14·1 answer
  • (3^6)^-2/(6^-9*-2^10)
    6·1 answer
  • Find the missing length in the similar figures.
    14·1 answer
  • Representa en la recta numérica los siguientes grupos de números enteros e identifica entre ellos cual es el menor y el mayor. a
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!