Answer:
periodical databases
Explanation:
Among the various databases you can now access in a library, the periodical databases contains the text and other information about articles published in magazines, journal and newspapers.
This database allows you for example to easily search for all articles written about a specific event or person, and it will return you the list of articles you can then read from a single spot, no matter where or when the article was written.
Answer:
Linux directories and their purposes are:
1) lib - Lib file contained the share object library file which necessary to boots system and this directory contain file module stored in the kernel.
2) etc - etc file is the configuration file that they are local in the machines. When the program run these file are stored in the directories. this can be static and do not executable directory.
3) Boot - Boot file are stored in the directory which required processing of linux boot and such files are included in the linux kernel of the file.
4) Root - Root file are the best user root directory and user cannot view this directories from there account. This file usually contain administrative file system.
5) Home - Home file contained the user directory and it is the default system of linux. Home directory helps user to enable any network system to access there home directories.
Selah infects the ads on a website with a technique called the Watering hole attacks.
<h3> What is Watering hole attacks?</h3>
The Watering hole attacks is known to be a form of attack that depends on compromising or infecting a website that has or that targeted users who are known to often frequently visit.
So, Selah infects the ads on a website with a technique called the Watering hole attacks.
Learn more about malware from
brainly.com/question/399317
#SPJ1
Answer:
background-color: (Color)
Explanation:
This is actually CSS coding, as you would code it like:
Body {
background-color: (Color)
}
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.