Slope is rise/run
so, you go up 4 times and run across 3 times, this is a positive slope, so the slope is
slope: 4/3
the y-intercept is the line that passes the y-axis, (0, -5),
y-intercept: -5
put it together
4/3x-5
Answer:
the third side is 40 m long
Step-by-step explanation:
The perimeter of the triangle is the sum of its three sides, and they give you what that value in meters is (120 m)
Your are given the length of two of them: 30 m and 50 m, and need to find the third one (let's call it "x" for this unknown side)
Now set the following equation:
Perimeter = side 1 + side 2 + side 3 --> replace these with the info you know
120 m = 30 m + 50 m + x --> add 30 m and 50 m obtaining 80 m
120 m = 80 m + x --> now solve for x (isolate the x on one side) by subtracting 80 m from both sides
120 m - 80 m = x --> perform the subtraction 120 m - 80 m = 40 m
40 m = x
Which tells us that the third unknown side has a length of 40 m
Answer:
a) 40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b) 34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question:

a)Less than 19.5 hours?
This is the pvalue of Z when X = 19.5. So



has a pvalue of 0.4013.
40.13% probability that a laptop computer can be assembled at this plant in a period of time of less than 19.5 hours.
b)Between 20 hours and 22 hours?
This is the pvalue of Z when X = 22 subtracted by the pvalue of Z when X = 20. So
X = 22



has a pvalue of 0.8413
X = 20



has a pvalue of 0.5
0.8413 - 0.5 = 0.3413
34.13% probability that a laptop computer can be assembled at this plant in a period of time between 20 hours and 22 hours.
Answer:
Below.
Step-by-step explanation:
To find the number of students in each grade you multiply the marks by the frequency density. The number of students is given by the area under the rectangles.
So to find the number of students with grade U (< 160) it is:
120 * 0.2 + 40*0.5
= 24 + 20
= 44.
The number for Grade E
= (200 - 160) * 0.5
= 40 * 0.5
= 20.
The others can be found in the same way.