675 people will have score between 85 and 120
Step-by-step explanation:
Given
Mean = 100
SD = 15
If we have to find percentage of score between two values we have to find the z-score for both values and then area under the curve for both values
z-score is given by:
for a value x:

So,
For 85:


Now we have to find the area under the curve for both values of z-score. z-score tables are used for this purpose.
So,
For z1 : 0.1587
For z2: 0.9082
The area between z11 and z2:

So the probability of score between 85 and 120 is 0.7495
As the sample is of 900 people, the people with scores between 85 and 120 will be:
900*0.7495 = 674.55 people
Rounding off to nearest whole number
675 people will have score between 85 and 120
Keywords: Probability, SD
Learn more about probability at:
#LearnwithBrainly
Answer:
Step-by-step explanation:
Work is said to be done when a force applied to an object cause the body to move in a specified direction.
Work-done = Force * Distance
Since Force = mass * acceleration due to gravity
Work-done = mass * acceleration due to gravity * distance
Given mass = 1.4kg, distance = 0.7m and g = 9.8m/s²
Workdone in lifting the book off the floor = 1.4*0.7*9.8
Workdone = 9.604Joules
- Similarly, work done in lifting a 21-lb weight book 6 ft off the ground is expressed using the same formula as above;
Given mass = 21-lb, g = 32ft/s² and distance = 6ft
Workdone = 21 * 32 * 6
Workdone = 4,032 lb-ft²/s²
Hence, work-done in lifting a 21-lb weight book 6 ft off the ground is 4,032 lb-ft²/s²
Answer:
85 ft
Step-by-step explanation:
for all right triangles, triangles with a 90 degree angle, the sides are equal to
where c is the hypotenuse, or the longest side.
so... 

c= 85
Answer:
14
Step-by-step explanation:
22-8=14
Answer:
7 ^ 6x + 2 = 7^15
taking log on both the sides
log 7^6x + 2 = log 7^15
6x + 2 log 7 = 15 log 7
log 7