Answer:
1. 10^(38)
2. total amount = 10^11 or total amount = $100000000000
Step-by-step explanation:
For every time that we multiply powers with the same base we maintain the base and sum the powers. Therefore we have:
1. (10^32)*(10^6)
10^(32 + 6)
10^(38)
2. If each of the 10^6 programmers make 10^5 then the total money they make together is the product of the number of programs with the sallary each makes. We have:
total = (10^6)*(10^5)
total = 10^(6 + 5)
total = 10^11
total = $100000000000
1. Change x = 4t into x = 3t

so

Answer A and D are wrong.
2. Change x = 4t into x = 2t

and

Answer b is correct.
3. Change x = 4t into x = 8t

and

Answer C. is correct, E. is wrong.
To minimize the cost, we take the straight distance from the refinery to the other side of the river as 2 km. Also, the 7 km will be the distance that has to be traveled by the pipeline in land. The total cost, C, is therefore,
total cost = (2 km)($800,000/km) + (7 km)($400,000 /km)
total cost = $4,400,000
Thus, the total cost of the pipeline is approximately $4,400,000.00.