B. There are 10Things to do to finish the project.and you have done 6 of them
Assume that the total overhead variance is x
We are given that the total labor variance is twice the total overhead variance. This means that, the total labor variance is 2x
Total variance can be calculated as follows:
Total variance = Total materials variance + Total overhead variance
+ Total labor variance
We have:
Total variance = $35000
Total materials variance = $14000
Total overhead variance = x
Total labor variance = 2x
Substitute in the equation and solve for x as follows:
35000 = 14000 + x + 2x
35000 - 14000 = 3x
21000 = 3x
x = 21000/3
x = 7000
Based on the above calculations:
Total overhead variance = x = $7000
Total labor variance = 2x = 2*7000 = $14000
Answer:
No solution
Option 4 is correct
Step-by-step explanation:
Given: The system of inequality


We need to choose correct option.
Option 1: (-5,2)
Put x=-5 and y=2
Equation 1 Equation 2


TRUE FALSE
Option 2: (2,2)
Put x=2 and y=2
Equation 1 Equation 2


FALSE FALSE
Option 3: (5,2)
Put x=-5 and y=2
Equation 1 Equation 2


FALSE TRUE
Option 1, 2 and 3 are incorrect because both equation must be true for solution.
Hence, Option 4 is correct no solution.
The value of x is 5/8.
<u>Step-by-step explanation</u>:
Given,
- The lines PQ and RS are parallel to each other.
- slope of PQ= x-1/4
- slope of RS = 3/8
The slopes of parallel lines are equal.
slope of PQ = slope of RS
⇒ x-1/4 = 3/8
⇒ (4x-1)/4 = 3/8
⇒ 8(4x-1) = 4(3)
⇒ 32x-8 = 12
⇒ 32x = 20
x = 20/32
x = 5/8
Step-by-step explanation:
f=1/g
4=1/-6
=-24
find f
f=1/-6