1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dsp73
3 years ago
14

OBEE

Mathematics
1 answer:
Rudik [331]3 years ago
8 0
Unicorn icon icon icon Oml lawn
You might be interested in
One number is 1/2 of another the sum of the number is 72 find the numbers
Anton [14]
The answer for the question is 36 , 36
5 0
3 years ago
1 pts
balu736 [363]

9514 1404 393

Answer:

  $935.11

Step-by-step explanation:

The amount is given by the formula ...

  A = P(1 +r/n)^(nt) . . . P invested at rate r for t years compounded n per year

  A = $850(1 +0.024/2)^(2·4) = $935.11

The amount accumulated will be $935.11 after 4 years.

8 0
2 years ago
mauricio estimates that the first module of the project could be completed in as few as 15 days or could take as many as 25 days
4vir4ik [10]

Answer:

<em>Most likely time, </em>according to PERT (Program evaluation and review technique).

Step-by-step explanation:

PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.

Inside PERT, there are different defined times to accomplished an activity in a project, that is:

  • An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
  • A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
  • A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
  • An <em>expected time</em>, an statistical estimation.

Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":

  • "[...] in as few as 15 days"  is the <em>optimistic time</em>.
  • "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
  • "[...] but most likely will require 20 days" is the <em>most likely time</em>.

As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.

3 0
3 years ago
In parallelogram FGHJ if m∡ GHJ=55˚ find m∡FGH
hodyreva [135]

Answer:

∠ FGH = 125°

Step-by-step explanation:

The consecutive angles in a parallelogram are supplementary, then

∠ FGH + ∠ GHJ = 180° , that is

∠ FGH  + 55° = 180° ( subtract 55° from both sides )

∠ FGH = 125°

4 0
3 years ago
Read 2 more answers
2x<img src="https://tex.z-dn.net/?f=2x%5E2%2B3x-9" id="TexFormula1" title="2x^2+3x-9" alt="2x^2+3x-9" align="absmiddle" class="l
Juliette [100K]

the answer will equal about 3,053

3 0
3 years ago
Other questions:
  • Do you mind o could use a little help
    12·1 answer
  • ANSWER NEEDED QUICK!<br><br> Divide: 5/8 divided by 3/4<br> 1/8<br> 5/6<br> 3/4<br> 1 1/2
    14·1 answer
  • In 2010, a city's population was 1,405,233 and it was decreasing at a rate of 1.1%. At this rate when will the city's population
    11·2 answers
  • Mr.Jackson bought 1 3/5 lb.of beef. He cooked 3/4 of it for lunch. How much does he have left
    10·1 answer
  • Select the correct answer.
    13·2 answers
  • X + y = 10<br> x - y = 2
    13·2 answers
  • A block is 12 g and volume is 6 what is the density
    11·1 answer
  • John has 4 dimes and 8 quarters in a box. Find the probability of drawing a dime.
    8·1 answer
  • The distance between point C to point AB is 12 centimeters
    7·1 answer
  • Find the quotient.<br> 18.)97.2
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!