First divide the rocks per 3/4 of an hour by 3 and multiply by 4 to get the production per hour. then subtract the already moved rocks from the total job and divide the answer by 16 (the rocks moved per hour) getting the time needed to move the rest
Answer:30
Step-by-step explanation: LxW (length x Width) 3x10=30.... Hope this helps... if you break it down then you can write down (10) on your page but the answer is 30
60, because 120 is bigger than a right angle, and the picture shows that it is definitely smaller than a right angle.
The slope of the line is “rise over run.” That’s the vertical change between the two points (the difference in the y-coordinates) divided by the horizontal change over the same segment (the difference in the x-coordinates).
The solutions to system of equations are the point of intersection of the graphs of the equations.
The point of intersection of the graphs of the given equation is (0, 2). Therefore, point (1, 1) is not a solution to the system of equation.