Answer:
A=4000, B=80, C=24
Step-by-step explanation:
You forgot to put the correct area model, I attached it to the answer.
We have the fact that Mountain Q is 4 times the height of Mountain P. That's the "4" we have in the left side of our model. It's like having a multiplication table, next to the "4" we have "A" and upper this we have "1000", the only thing we have to do is multiplify 4*1000=4000. The next letter we have is B and below it we have "320", we divided it by 4, 320/4=80. The last letter we have is C, and is below a "6", we only have to multiplify it by 4, 6*4=24.
At the end we only sum our
- A + 320 + c = 4344 (4 times the height of Mountain P).
- 1000 + B + 6 = 1086(the height of the Mountain P).
Answer:
The answer would be B!
Step-by-step explanation:
In the chart if you divide the number of days over due to the cost of the fine, you get 5/2 every time. therefore, if y is the cost in cents and x is the days overdue, you would multiply x5/2 or y=5/2x, so your answer is B (y=5/2x).
hoped this helped :D
Answer:
The probablity is 11
Step-by-step explanation:
I am sure it's 11
Hope this answer helps you :)
Have a great day
Mark brainliest
The answer is the first one; it is an arithmetic sequence with a common difference of -40.