First you convert centimeters to meters which will be 35 centimeters-> 0.35 meters
Once you have that, you multiply String A's length (0.35 m) by 5 to find String B's length which will be 1.75 meters.
Now that you have the two lengths you multiply each by 17.
17 x 1.75 = 29.75 and 17 x 0.35 = 5.95
Now you just add 29.75 and 5.95 and you get your answer which is
35.7 meters
Add those ingredients. Or add the question you need help with
Answer:
slope = -1
Step-by-step explanation:
slope formula: (y2-y1)/(x2-x1)
(1-2) divided by (9-8) = -1/1 = -1
slope = -1
you can switch it up by doing (9-8) divided by (1-2), but it won't make a difference I think.
Answer:
8x(6+7)
Step-by-step explanation:
Answer:
25 students
Step-by-step explanation:
What we need to do here is to do some tracing. We simply need to go to the point on the concert band where we have the value 35.
After sighting this value, we then make a tracing to the line of best fit. Then from this line of best fit, we trace the point on the matching band that correlated with the value 35.
If properly traced, we would arrive at a value of 25 on the marching band