Answer:
Option A - They are responsible for writing programming
Option B - They are usually strong problem-solvers
Explanation:
A software engineer needs to be a strong problem solver and he/she must be able to write program/code. He/She is not required to conduct experiments in labs and also it is not essential for them to hold masters degree as even the non computer science or IT background people are working as software engineer.
Hence, both option A and B are correct
All options in the Advanced tab in the Share Workbook dialog box.
- Don’t keep change history
- Show comments made by all users
- Update changes when file is saved
- Track changes for certain amount of days
- Allow changes by more than one user at a time
- Automatically update changes in certain time periods
<u>Explanation:</u>
In shared workbook in advanced tab it has following options. Based on end user selection changes are applied on shares workbook.
1. Either keep the history for certain period or don’t keep the history on shared workbook.
2. On share work Save changes on period schedule (automatically update) or just see other user changes.
3. Before changes are made for share workbook either prompt for save option or last modified saved.
4. Printer review and filter setting for personal view.
The answer that isn't an example of plagiarism would be 'D. Quoting with Source' that means you are giving credit where credit is due and not taking or copying other work which is the definition of plagiarism.
I'm not sure about the second one but I believe it might be 'A. Students and Teachers'.
Hope this helped!
Normal or random variations that are considered part of operating the system at its current capability are <u> c. common cause variations.</u>
Explanation:
Common cause variation is fluctuation caused by unknown factors resulting in a steady but random distribution of output around the average of the data.
Common-cause variation is the natural or expected variation in a process.
Common-cause variation is characterised by:
- Phenomena constantly active within the system
- Variation predictable probabilistically
- Irregular variation within a historical experience base
It is a measure of the process potential, or how well the process can perform when special cause variation removed.
Common cause variation arises from external sources that are not inherent in the process and is where statistical quality control methods are most useful.
Statistical process control charts are used when trying to monitor and control 5- and 6-sigma quality levels.