Answer:

Step-by-step explanation:
Given
Required
Determine the area in terms of time
From the question, we have:
-> radius per time
and
--> area from radius
The interpretation of the question is to find the composite function: a(t)
If
, and
, the
Substitute 0.5t for r



Answer:I guess 6 ft as you gave same options
Step-by-step explanation:
Answer: 8 minimum work stations is what would be needed.
Step-by-step explanation:
The cycle time is computed as the operating time daily divided by the scheduled output.
It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.
Therefore,
If you need to produce 30units/hour.
The average cycle time is as follow:
The average cycle time is the average time between the completions of units.
60/30= 2 average cycle time
=16/2
=8
8 work stations is the minimum number that would be needed.
It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.
I believe the answer is A 3^7
Answer:
the third one
Step-by-step explanation: