Answer: Choice B) -4
The lower quartile, also known as Q1 or the first quartile, is the left edge of the box. In this case, that is at -4. We can drop a vertical line from the left edge of the box until we hit -4 on the number line.
Side Note: 25% of the data values are below Q1, while 75% of the data values are above Q1
Perimeter=2L+2W, in this case L=80+2(25) and W=170+2(25) so
P=2(L+W)=2(80+50+170+50)
P=2(350)=700m
Answer:
791.28
Step-by-step explanation:
1. 3.14*9²=254.34
2. 3.14*9*19=536.94
3. 536.94+254.34=791.28