6. 16x60x24=23040cm3 of water, 23040-7200=15840cm3 ans: 15840cm3
1. 10cm3
4. 250cm3
5. 3600-2880=720 ans: 720 cm3
Answer:
<em>The correct option will be: $295,680</em>
Step-by-step explanation:
Each Pod requires 1.4 direct labor-hours at $9.60 per direct labor-hour.
So, <u>the total direct-labor cost for each Pod</u> will be: dollars.
In June the company has budgeted to produce 22,000 Pods.
So, <u>the direct-labor cost for all 22,000 Pods</u> will be:
Thus, the budgeted direct labor costs incurred in June would be $295,680.
Es 24.......................
36.00 ÷ (1 - 0.25)
36.00 ÷ 0.75
$48
Hope this helps!