The properties of matter which would help her to determine if the two substances are the same is:
<h3>Solubility</h3>
This refers to the ability of a liquid to dissolve into a given solvent at a particular temperature.
With this in mind, we can see that this would help the student to find out if the two liquids are the same.
Therefore,, the correct answer is option B
Read more about solubility here;
brainly.com/question/23946616
Answer:
its
Explanation:
(C) i had to do that 1 and got it right
Answer: Stimulus perception relationship
Explanation:
Stimulus perception relationship could be defined as the ability for an organism to react based on an action on it by another party. This relationship is used to know the behavior of an organism. Jamie's action of using shadows for the cat and wanting to see the cats reaction is understood to be a stimulus perception relationship.
Answer:
The answer is - Satisfaction
Explanation:
The options are;
A) perceived value
B) satisfaction
C) equity
D) engagement
E) lifetime value
The answer is B- Customer Satisfaction
Customer satisfaction is defined as a customer or consumer's overall happiness that shows the fulfillment he or she derives from doing business with a firm or using a particular product or service. It is often abbreviated as CSAT. As Sally attempts to find out if the lotion meets her expectations she is measuring her level of customer service.
Answer:
The answer is below
Explanation:
During the project life cycle before final completion, there are various stages involved, and each of these stages are packed with their challenges that may sometimes cause the failure of the project completion, either causing delays, or sometimes outright abandonment of the project.
Hence, the needs the look for the potential signs if a current project is experiencing issues, so as to solve them, and eliminate the issues immediately.
Some of the signs to be identified if a current projects is experiencing issues are:
1. The mapped out project duration is not being followed or overlapped
2. The actual or running cost of project execution is going beyond the budgeted cost of the project in each stage of the project.
3. The vital cog personnels to the project are leaving before their expected exits.
4. Decision makers are found wanting, during project meetings and critical path decision periods.
5. The vital parts of the projects are getting delayed in execution.
6. Low or under funding of the project.