Answer:
-1 1/2
Step-by-step explanation:
Answer:
21 weeks
Step-by-step explanation:
In this question, we are to use proportionality to find the solution to the question.
We were made to know that the time taken to build the highway is varied directly with the length and inversely with the number of workers.
Let us make a mathematical representation for this.
Let the time be t, number of workers be w and length be l
t is directly proportional to l and inversely proportional to w
Mathematically;
t = kl/w
Where k is the constant of proportionality.
Let’s find the value of k
150 workers built 12 miles of highway in 14 weeks ; plug these in the equation to get k
14 = k * 12/150
k = 150 * 14/12 = 175
Now we want to get t given w and l
from ;
t = kl/w
We can get t; where l = 15 and w = 125
t = 175 * 15/125
t = 21 weeks
Answer:
Acute scalene triangle.
Step-by-step explanation:
Acute scalene triangle.
Sides: a = 4 b = 7 c = 8
Area: T = 13.998
Perimeter: p = 19
Semiperimeter: s = 9.5
Angle ∠ A = α = 29.995° = 29°59'41″ = 0.524 rad
Angle ∠ B = β = 61.028° = 61°1'42″ = 1.065 rad
Angle ∠ C = γ = 88.977° = 88°58'37″ = 1.553 rad
Height: ha = 6.999
Height: hb = 3.999
Height: hc = 3.499
Median: ma = 7.246
Median: mb = 5.268
Median: mc = 4.062
Inradius: r = 1.473
Circumradius: R = 4.001
Vertex coordinates: A[8; 0] B[0; 0] C[1.938; 3.499]
Centroid: CG[3.313; 1.166]
Coordinates of the circumscribed circle: U[4; 0.071]
Coordinates of the inscribed circle: I[2.5; 1.473]
Exterior (or external, outer) angles of the triangle:
∠ A' = α' = 150.005° = 150°19″ = 0.524 rad
∠ B' = β' = 118.972° = 118°58'18″ = 1.065 rad
∠ C' = γ' = 91.023° = 91°1'23″ = 1.553 rad
75% cus u divide the denominator by the numerator is 5 and 8
Answer:
at least above 3$
Step-by-step explanation: