Answer:
a. 95.4
b. UCL = 96.07
LCL = 94.73
c. Process is in control
Step-by-step explanation:
a. The computation of estimate mean is shown below:-

= 95.4
b. The computation of Upper Control Limit (UCL) and the Lower Control Limit (LCL) for the manufacturing process is shown below:-


= 95.4 + 0.67082
= 96.07


= 95.4 - 0.67082
= 94.73
c. The explanation is shown below:-
From the above calculation we can see that the sample lies between LCL AND UCL that is (94.73 ,96.07) ,
The Process is in control
Answer:
Step-by-step explanation:
so what your gonna do is you are going to add 81 to 360 and then sum it up. after you are going to divide it by 3.5.
This might be wrong but there is always a point where you have to try :)
Answer:
3√2
Step-by-step explanation:
−3√2+3√8
=3√2 (Decimal: 4.242641)
Answer:
The value of the expression increases as j decreases
Step-by-step explanation:
Let 

As j decreases, the value of j300 decreases (i.e the farther j300 is from 150). Due to the wider gap between 150 and j300, the value of f(j) increases.
For example:
When j = 1, f(j) = 150 - (300*1) = -150
When j = 0.5, f(j) = 150 - (300*0.5) = 0
When j = 0. f(j) = 150 - (300*0) = 150
It is obvious from the analogy above that the expression 150-j150−j150 increases as j decreases
Three planes a distinct lines have in common