Consider these specific values of x.
For example, if x=10, then <span>C(10)=16(10)+36,000=160+36,000=36,160 (say $)
and R(10)=18*10=180.
So if only 10 units are produced, the total cost is 36,160, while the revenue is only 180 (again, say $.)
If, for example, x=1000, then we can calculate
</span><span>C(1000)=16*1000+36,000=16,000+36,000=52,000
and
R(1000)=18*1000=18,000.
This suggests that with higher values of x, we can get to a particular point where the Cost and Revenue are the same. To find this point, we set the equation:
C(x)=R(x),
which gives us that particular x at which both </span>C(x) and R(x) give the same value.
Thus, we solve <span>16x+36,000=18x. Subtracting 16x from both sides 2x=36,000, then x = 36,000/2=18,000.
Answer: 18,000
</span>
Answer:
"...charges a flat rate of $5.00..." Flat rates in the business world is what we call constants in the mathematical word. That is, if we have a flat rate, that number doesn't change for anything because it has no variable attached to it (unless otherwise noted). You can identify what the constants are because they do not have the tags "per", "each", or "for every" attached to them when in the English language. In this case, this number remains the same no matter if 1 package gets shipped or a 1000 packages get shipped. So, we have the first part of our equation:
$5.00...
Step-by-step explanation:
Answer:
i believe the answer is 3.4
explanation:
6.5 + x = 9.9
x = 3.4
Part A.
What we can do to solve this problem is to assume that
the acceleration of Bryan is constant so that the velocity function is linear.
The standard form of a linear function is in the form:
y = m x + b
or in this case:
v = m t + b
where v is velocity and t is time, b is the y –intercept of
the equation
The slope m can be calculated by:
m = (v2 – v1) / (t2 – t1)
m = (12 – 15) / (7 – 4)
m = -1
Since slope is negative therefore this means the cyclist
are constantly decelerating. The equation then becomes:
v = - t + b
Now finding for b by plugging in any data pair:
15 = - (4) + b
b = 19
So the complete equation is:
v = - t + 19
This means that the initial velocity of the cyclists at t
= 0 is 19 km / h.
Part B. What we can do to graph the equation is to
calculate for the values of v from t = 0 to 12, then plot all these values in
the Cartesian plane then connect the dots.
Answer:
Step-by-step explanation: