I think it’s number 1. Check the answer first.
Answer:
The answer is "Option d".
Explanation:
The Iteration Management is also an activity in which all members of the team will determine how many the backlog team will allocate towards the next Iteration, and each team wraps up the work only as a group of determined iteration targets. in the given question the "choice d" is correct because The plans to achieve without training entered PO or design staff and requirements have not even been identified, and the wrong choice can be defined as follows:
- In choice A, T' he PO doesn't give the story detail, that's why it's incorrect.
- In choice B, the doesn't a team left the past for more refining with the PO in the Project Backlog, that's why it's incorrect.
- In choice C, The Development Team has not found some other team dependency, that's why it's incorrect.
<span>The best and most correct answer among the choices provided by the question is the fourth choice.
A way of determining that a site is realiable is examining comments about the <span>webpage.</span></span><span>
I hope my answer has come to your help. God bless and have a nice day ahead!</span>
Answer:Both Technicians A and B are correct.
Explanation:Teflon is a florinated polymer it is polytetrafluroethylene (PTFE). It is widely used in different fields and the making of materials for both home and industrial use. Teflon rings does requires special tools for proper installation which is called TEFLON RING INSTALLER.
Warming the a Teflon ring in water or oil at 130-140°F for about 5 minutes will help to soften the material for easier installation. cover wear ring grooves with plastic tape.