Answer:
according to meh it's -213
\(◎o◎)/
Speed = slope of the line = 20 / 0.5 = 40 km / hr
Second part will be a line with downward slope from the end of the horizontal line Slop = 20 / 1/3 (=60 km/h) So it will pass through the 65 on horizontal axis.
The 1 weeks is longer because the hours is like 53 days and the weeks are like 133 days
1/12 is the answer i think