When you factor out this equation you get:
(2a+3b)(5a²-2b²)
Answer:
First question: LCL = 522, UCL = 1000.5
Second question: A sample size no smaller than 418 is needed.
Step-by-step explanation:
First question:
Lower bound:
0.36 of 1450. So
0.36*1450 = 522
Upper bound:
0.69 of 1450. So
0.69*1450 = 1000.5
LCL = 522, UCL = 1000.5
Second question:
In a sample with a number n of people surveyed with a probability of a success of , and a confidence level of , we have the following confidence interval of proportions.
In which
z is the zscore that has a pvalue of .
The margin of error is:
The project manager believes that p will turn out to be approximately 0.11.
This means that
95% confidence level
So , z is the value of Z that has a pvalue of , so .
The project manager wants to estimate the proportion to within 0.03
This means that the sample size needed is given by n, and n is found when M = 0.03. So
Rounding up
A sample size no smaller than 418 is needed.
The answer is 27 because 10+17=27
Answer:
option A
output = constant / input
Step-by-step explanation:
Inverse relationship between two input and output means that they both moves in opposite directions, if one increases than other decreases.
Equation to describe relationship of inverse variation between input and output will be as following
<h3> output ∝ 1 / input</h3>
to remove this sign of proportionality
<h3> output = k / input </h3>
where k is a constant
Answer:
y=-1/2x+3
Step-by-step explanation:
it has a negative slope and it's not that steep which is why the slope isnt 2. also the first one is wrong because the y-intercept is 3