Answer:
4/15 and 0.26
Step-by-step explanation:
Here, we want to write the fraction and decimal that matches the division problem
The division problem is simply 4/15 in fraction
In decimal, this is 0.2667
Answer:
Determine whether the equation has the form x=a, and if it does, the equation has one solution.
Answer:
y=27.8
Step-by-step explanation:
- 8^2=17^2+16^2-2(16)(17)cosY
- 8^2-17^2-16^2/-2(17)(16)=cosY
- -481/-544=cosY
- 0.8842=cosY
- Y is about 27.8
Answer:
A = 25.758 m²
Step-by-step explanation:
Width of the sand pit, b = 2.7 m
Length of the sand pit, l = 9.54 m
We want to cover the sand pit with a piece of plastic. We need to find how many square meters of plastic will be needed to cover the sand pit. It is equal to the area of sand pit. It is in the shape of rectangle. Its area is given by :
A = l × b
A = 2.7 × 9.54
A = 25.758 m²
So, 25.758 m² of plastic will be needed to cover the sand pit.
Μ = (0×0.026) + (1×0.072) +(2×0.152) + (3×0.303) + (4×0.215) + (5×0.164) + (6×0.066)
μ = 0 + 0.072 + 0.304 + 0.909 + 0.86 + 0.82 + 0.396
μ = 3.361 ≈ 3.4
We need the value of ∑X² to work out the variance
∑X² = (0²×0.026) + (1²×0.072) + (2²×0.152) + (3²×0.303) + (4²×0.215) + (5²×0.164) + (6²×0.066)
∑X² = 0+0.072+0.608+2.727+3.44+4.1+2.376
∑X² = 13.323
Variance = ∑X² - μ²
Variance = 13.323 - (3.4)² = 1.763 ≈ 2
Standard Deviation = √Variance = √1.8 = 1.3416... ≈ 1.4
The correct answer related to the value of mean and standard deviation is the option D
<span>
An employee works an average of 3.4 overtime hours per week with a standard deviation of approximately 1.4 hours.</span>