1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Whitepunk [10]
2 years ago
13

Express each as ratio in the simplest form.:

Mathematics
1 answer:
bija089 [108]2 years ago
5 0

Step-by-step explanation:

1) 15/60 = 3/12 = 1/4

2) 8/36 = 4/23

You might be interested in
Malik considers the enlargement of the trapezoid
nevsk [136]

Answer:

Uh that's great- you missed something I'm sure

Step-by-step explanation:

6 1
2 years ago
Is 1:2:3 equivalent to 2:4:6​
Finger [1]

Answer:

Yes it is.

Step-by-step explanation:

Just multiply everything by 2.

5 0
2 years ago
A heavy rope, 50 ft long, weighs 0.6 lb/ft and hangs over the edge of a building 120 ft high. Approximate the required work by a
Anastasy [175]

Answer:

Exercise (a)

The work done in pulling the rope to the top of the building is 750 lb·ft

Exercise (b)

The work done in pulling half the rope to the top of the building is 562.5 lb·ft

Step-by-step explanation:

Exercise (a)

The given parameters of the rope are;

The length of the rope = 50 ft.

The weight of the rope = 0.6 lb/ft.

The height of the building = 120 ft.

We have;

The work done in pulling a piece of the upper portion, ΔW₁ is given as follows;

ΔW₁ = 0.6Δx·x

The work done for the second half, ΔW₂, is given as follows;

ΔW₂ = 0.6Δx·x + 25×0.6 × 25 =  0.6Δx·x + 375

The total work done, W = W₁ + W₂ = 0.6Δx·x + 0.6Δx·x + 375

∴ We have;

W = 2 \times \int\limits^{25}_0 {0.6 \cdot x} \, dx + 375= 2 \times \left[0.6 \cdot \dfrac{x^2}{2} \right]^{25}_0 + 375 = 750

The work done in pulling the rope to the top of the building, W = 750 lb·ft

Exercise (b)

The work done in pulling half the rope is given by W₂ as follows;

W_2 =  \int\limits^{25}_0 {0.6 \cdot x} \, dx + 375= \left[0.6 \cdot \dfrac{x^2}{2} \right]^{25}_0 + 375 = 562.5

The work done in pulling half the rope, W₂ = 562.5 lb·ft

6 0
2 years ago
What is the rate of change for y = 2 − 3/5x
dalvyx [7]

Answer: -3/5

Step-by-step explanation:

4 0
3 years ago
Defined as bounded by two distinct end points that contain every point on the line between its end points.
Alja [10]
This would be the term referred to as a line segment. I hope this helps!
8 0
3 years ago
Read 2 more answers
Other questions:
  • The expression 9+219+21 factored using the GCF is
    6·1 answer
  • There are 16 books on a shelf. Four sixteenths of the books are about animals. Two and adventure. The rest are mystery. How many
    14·1 answer
  • Evan has a shell collection. On Monday he found 6 new shells. On Tuesday , he gave 9 shells to his friends. After giving the she
    13·1 answer
  • -3y &gt; 9 or 2y – 6 &gt; 2<br><br> Pls solve with steps and explain
    5·1 answer
  • 13 is at least the difference of a number v and 1
    5·1 answer
  • HELP PLEASE PLEASE PLEASE!!The function f(x) = 4x – 8 is reflected across the y-axis, resulting in a new function, g(x). Write t
    6·1 answer
  • Please help, Ill mark brainiest if it helps.
    15·1 answer
  • A group of students travel 14 miles in 3 days. If they travel the same amount of miles each day, about how many miles does the g
    9·1 answer
  • Convert the following quadratic from vertex form to standard form. Y=(x-1)^2-1
    7·1 answer
  • What is the solution of this inequality?
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!