I would say the answer is D. I’m not 100% sure but that seems to make the most sense.
Answer:
Beginning WIP= 122,000
Explanation:
Giving the following information:
Cost of goods manufactured= $524,000
Ending work in process= $79,000
Raw materials used in the production of $89,000
Direct labor of $145,000
Manufacturing overhead of $247,000
To calculate the beginning work in process we need to use the cost of goods manufactured formula:
cost of goods manufactured= beginning WIP + direct materials + direct labor + allocated manufacturing overhead - Ending WIP
524,000= Beginning wip + 89,000 + 145,000 + 247,000 - 79,000
Beginning WIP= 122,000
Answer:
Bond's Current Yield 4.39%
Explanation:
The bond's current yield is calculated as below:
Bond's Current Yield = Annual Coupon Payment/Current Bond Price*100
Substituting values in the above formula, we get,
Bond's Current Yield = (100*4.30%)/97.85*100 = 4.39%
Answer:
0.1875; 0.375; 0.4375
Explanation:
Given that,
Adobe Systems stock = $3,000
Dow Chemical = $6,000
Office Depot = $7,000
Total Value of stock:
= Adobe Systems stock + Dow Chemical + Office Depot
= $3,000 + $6,000 + $7,000
= $16,000
Portfolio weights of Adobe Systems stock:
= Value of Adobe Systems stock ÷ Total Value of stock
= $3,000 ÷ $16,000
= 0.1875
Portfolio weights of Dow Chemical stock:
= Value of Dow Chemical stock ÷ Total Value of stock
= $6,000 ÷ $16,000
= 0.375
Portfolio weights of Office Depot stock:
= Value of Dow Chemical stock ÷ Total Value of stock
= $7,000 ÷ $16,000
= 0.4375
The inventory control manager at Wheeled Coach would need to have ABC investigation as well as actualize tight physical control of the stockroom. He would likewise execute a cycle tallying framework, and guarantee that issues require building change sees for those things not at first included on the bill of material. To the degree attainable, stockrooms would be united.