B- interior designer !!! Being able to design is an import part in showing off your creative side :) hope this helps
Explanation:
To find the probability that the sample which fails to meet the required weight or the standard weight of the marshmallows having banana flavor if the process of production is working, such that probability for the weekly sample leads to shutdown of the production if the process of the production is running properly of 1 % of the probability that at least five boxes out of the twenty five sample fails to meet the standard weight which is less than one percent that is 
We know that for p = 0.8, 
Now using binomial simulation, we can determine that
for p = 0.0452
So the production process is to be redesigned for reducing the percentage of boxes of the Go Bananas of 16 ounces which failed to meet the required weight of the marshmallows having banana flavor if the production process is working properly to 5.42 percent.
To answer this item, we let x be Jeff's speed when going back home. With this representation, the speed from home to his parents is x + 9. The total time it took him for the trip is 8 hours. The time of each trip can be calculated by dividing the distance by time. Such concept is presented below.
8 hours = 160/x + 160/(x + 9)
The value of x from the equation is 36. Thus, his speeds were 36 miles/h and 45 miles/h.
Answer:
Explained below:
Explanation:
The basic similarity between TQM and Six Sigma quality-management techniques is that each one is a quality control approach and the basic difference between Six Sigma and TQM is the method that each one addresses quality check.TQM determines quality up to that level to which a product attends standards designed inside the company while Six Sigma trades the representation of quality to a relational one, maintaining that quality is based on the fewer number of lacks, which is necessary to be eliminated as much as attainable.
Answer:
Explanation:
The journal entries are shown below:
1. Petty cash A/c Dr $264.2
To Cash A/c $264.2
(Being petty cash fund established)
2. Freight - in expense A/c Dr $75
Supplies expense A/c Dr $40
Postage expense A/c Dr $48
Loan to employees A/c Dr $32
Miscellaneous expense A/c Dr $51
Cash over and short A/c Dr $2.9
To Cash A/c Dr $248.9 ($264.2 - $15.3)
(Being disbursement of cash recorded)
3. Petty Cash A/c Dr $115
To Cash A/c $115
(Being increase in petty cash recorded)