Answer:
3. MNP = OPN
Step-by-step explanation:
the second could be as well, but the sequence is the same for the third option, thus the second option is wrong
Answer:
9 1/5
Step-by-step explanation:
Step 1: (-2 2/3) x (-3 5/4)
|
Step 2: (-2 2/3) x ( -7/4)
Step 3: = 9 1/5
Hope this helps!
Answer:
640
Step-by-step explanation:
Parallel lines have same slope, so first isolate y to get the equation into y=mx+b form.
-2x+3y=2
3y = 2x + 2

Now plug the point (3,4) into y = 2x + b
4 = 2(3) + b
Solves for be
b = -2
So the new equation is y = 2x - 2
Answer:
0.4
Step-by-step explanation:
so, Katherine can do 0.1 of the job per hour. (if she needs 10 hours for the job, each hour she can do the whole divided by the time, so 1/10, which is 0.1)
if in two hours she and Marina can be done, then Marina will do 1(the whole job)-2/10 (twice as much as she can do in an hour)=0.8 of the job. So if Marina does 0.8 of the job in two hours, each hour she will do half of it: 0.4 - and this is the correct answer