1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
diamong [38]
2 years ago
13

Find the slope the in clearest form

Mathematics
1 answer:
zhannawk [14.2K]2 years ago
5 0

Answer:3/5

Step-by-step explanation:

You might be interested in
A student has a savings account earning 3% simple interest. She must pay $1900 for first-semester tuition by September 1 and $19
Anastaziya [24]

Answer:

$3781.19

Step-by-step explanation:

Let us assume that the student has to earn $(1900 + x) by September 1 so that he can pay the $1900 tuition fee by September 1 and the remaining $x will grow at 3% simple interest to make him able to pay another tuition fee of $1900 by January 1.

So, we can write x( 1 + \frac{4 \times 3}{12 \times 100}) = 1900

{Because September 1 to January 1 is 4 months and the monthly simple interest rate is \frac{3}{12}%}

⇒ 1.01x = 1900

⇒ x = $1881.19 (Rounded to the nearest cents)

Therefore, the student has to earn $(1900 + 1881.19) = $3781.19 (Answer)

8 0
3 years ago
Last year, a French restaurant used 792,800 ounces of cream. This year, due to a menu
ser-zykov [4K]
The correct answer is a 15% decrease. Explanation (792,800 - 673,880) / 792,800
8 0
3 years ago
Is 0.45545455545… a rational or irrational number?
bonufazy [111]

Answer:

If the number is infinite then it's irrational

3 0
3 years ago
A television​ network, Network​ A, is scheduling its fall lineup of shows. For the Tuesday night 8 p.m.​ slot, Network A has sel
Mazyrski [523]

Answer:

The number of viewers Network A expects will watch their show is 1.4 million viewers.

Step-by-step explanation:

The expected value is calculated by multiplying the possible outcomes by the probability of their occurrence and adding the results

Therefore, we have the expected value given by the following expression;

Estimated network A viewers  where network B schedule top show = 1.1 million viewers

Estimated network A viewers where network B schedule a different show = 1.6 million viewers

Probability that Network B will air its top show = 0.4

Probability that Network B will air another show = 0.6

We therefore have;

Expected value, E of Network A viewers is therefore;

E = 1.1 × 0.4 + 1.6 × 0.6 =  0.44 + 0.96 = 1.4 million viewers.

Network A expects 1.4 million viewers will watch their show.

3 0
3 years ago
Simplify this expression: 19 – (–8) – (–14) = ? <br> A. –7<br> B. –3<br> C. 41<br> D. 25
Mrac [35]
The answer is C. 41. 
6 0
4 years ago
Other questions:
  • The answer please ?????
    5·1 answer
  • Carlson city and mason city are 15 miles apart. if you leave carlson city and drive at 45 miles per hour, how long does it take
    8·1 answer
  • Simplify this expression
    5·1 answer
  • Oil is leaking from a tanker at the rate of R(t) = 2000e^(-0.2t) gallons per hour where t is measured in hours. How much oil lea
    9·1 answer
  • If point F is translated 2 units to the left and 2 units down, what are the coordinates of F'?
    11·1 answer
  • The following set of coordinates represents which figure? (−5 ,2), (−3, 4), (1, 0), (−1, −2) (6 points)
    7·2 answers
  • How many triangles are there is a circle?
    8·1 answer
  • Use substitution to determine which value of x makes the equation 12+x=14.2 true.
    13·2 answers
  • People still doin homework or work?
    12·2 answers
  • Can anyone help me out with proofs ? If B is midpoint of AC and D is the midpoint of CE prove BD is parallel AE.
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!