Answer:
The 99% confidence interval for the proportion of all American adults who blame Barack Obama a great deal or a moderate amount for U.S. economic problems is (0.4894, 0.5706)..
Step-by-step explanation:
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.

In which
z is the zscore that has a pvalue of
.
For this problem, we have that:

99% confidence level
So
, z is the value of Z that has a pvalue of
, so
.
The lower limit of this interval is:

The upper limit of this interval is:

The 99% confidence interval for the proportion of all American adults who blame Barack Obama a great deal or a moderate amount for U.S. economic problems is (0.4894, 0.5706)..
Answer:
- d - cost
- a - number of attendees
<u>If budget is $99, then the equation is:</u>
- 99 = a + 96
- a = 99 - 96
- a = 3
Maximum number of attendees is 3
<u>Answer-</u> Length of the curve of intersection is 13.5191 sq.units
<u>Solution-</u>
As the equation of the cylinder is in rectangular for, so we have to convert it into parametric form with
x = cos t, y = 2 sin t (∵ 4x² + y² = 4 ⇒ 4cos²t + 4sin²t = 4, then it will satisfy the equation)
Then, substituting these values in the plane equation to get the z parameter,
cos t + 2sin t + z = 2
⇒ z = 2 - cos t - 2sin t
∴ 


As it is a full revolution around the original cylinder is from 0 to 2π, so we have to integrate from 0 to 2π
∴ Arc length



Now evaluating the integral using calculator,

Answer:
-350% -0.4% -40% -37.5% hope this helps!
Step-by-step explanation:
Answer:
Kinda confusing but, I think it is
a=7
b=9
c=19
d=7
sorry it took a while it was confusing and plz give brainliest
Step-by-step explanation: