1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
postnew [5]
2 years ago
15

PLEASE HELP!!! NO LINKS PLEASE!!!! 50 POINTS!!!!!

Computers and Technology
1 answer:
iragen [17]2 years ago
5 0

Answer:

ang hirap naman plss answee

You might be interested in
Generally speaking, manufacturing overhead is applied to production by means of a __________ __________ __________, which is com
Mkey [24]

Answer: Predetermined Overhead Rate, Estimated Manufacturing Overhead and Annual Activity Level.

Explanation:

Generally speaking, manufacturing overhead is applied to production by means of a predetermined overhead rate, which is computed under the general formula of dividing estimated overhead rate by some measure of the annual activity level.

A predetermined overhead rate is usually calculated at the beginning of an accounting period. It is calculated by dividing the estimated manufacturing overhead by an activity driver (e.g machine hours).

5 0
3 years ago
Read 2 more answers
Write its features:features of computer ​
Digiron [165]

Answer:

There are different characteristics of a computer is the following below.

Speed.

Accuracy.

Diligence.

Reliability.

Versatility.

Storage Capacity.

Automatic.

Quick Decision.

Explanation:

Sorse  

System https://quicklearncomputer.com

Mark brainlist if you want ¯\_(ツ)_/¯

5 0
2 years ago
Write a program to find all integer solutions to the equation 4x + 3y -9z = 5 for values of x, y, and z between 0 to 100.
rjkz [21]

Answer:

Following are the code to the given question:

#include <iostream>//header file

using namespace std;

int main()//main method

{

  int c= 0;//defining integer variable to count number of solutions

  int x,y,z;//defining integer variable which is used in the loop

  for (x = 0; x <= 100; x++)//defining for loop to x value

     for (y = 0; y <= 100; y++)//defining for loop to y value

        for (z = 0; z <= 100; z++)//defining for loop to z value

           if (4 * x + 3 * y - 9 * z == 5)//use if to check given condition

           {

              c++;//increment count value

              cout << "(" << x << "," << y << "," << z << ")";//print solutions  

              cout << (c % 11? " " : "\n");//use for add file solution in a row

           }

  cout << "\n\nThere are " << c << " solution(s)\n";//print solution couts

  return 0;

}

Output:

Please find the attached file.

Explanation:

In the above-given code four integer variable "x,y,z, and c" is declared, in which "x,y, and z" is used in the for loop with the if conditional statement that checks the given condition and prints the solution and the "c" variable is used to counts the number of solution, and at the last, it uses the print method to print its values.  

8 0
3 years ago
A) What is the maximum value that can be represented as an unsigned n-bit binary integer?
My name is Ann [436]

Answer:

The maximum value that are represented as unsigned n -bit binary integer is 2^n-1. The unsigned binary integer refers to the fixed point of the system that does not contain any fractional digits.

The unsigned binary integer contain module system with the power 2. The number of student table in the class is the best example of the unsigned integer. The numbers can be represented by using the binary notation and bits in the computer system.

5 0
3 years ago
Good day Statistical Methods tutor , I would like to know the formula for calculating the percentage of stockouts for the given
sveticcg [70]

In order to derive the probability of stock outs, divide the total value of the stock outs by the number of requests demanded. The resulting figure must then be multiplied by 100.

<h3>What is a stock out?</h3>

In business, a stock out refers to a condition where in a certain item or items are no longer available in stock.

The formula can be sated simply as:

Probability of Stock outs = (No of stock outs/ number of demand requests) x 100

Thus Number of Stock outs = Total probability of stock outs * total number of demand requests.

<h3>What is the formula for the Total Cost?</h3>

The formula for Total Cost is given as:

Total Fixed Cost + Total Variable Cost;

TC = TFC + TVC

Learn more about stock outs at:
brainly.com/question/16209393
#SPJ1

5 0
2 years ago
Other questions:
  • _______________________ is a short-term program, typically 30 hours long, in which a therapist, social worker, or trained probat
    5·1 answer
  • What is secondary exchange ? - Apex
    14·1 answer
  • The area on your screen where you can access the tab and menu options for word is called what?
    8·2 answers
  • Using underlining and italics at the same time is which of these? A. allowed but might be overkill B. always a good idea C. not
    15·2 answers
  • An array of integers named parkingTickets has been declared and initialized to the number of parking tickets given out by the ci
    14·1 answer
  • An attacker compromises the Washington Post's web server and proceeds to modify the homepage slightly by inserting a 1x1 pixel i
    12·1 answer
  • What is the disadvantages of using proprietary software
    10·2 answers
  • You have just purchased a motherboard that has an LGA 1156 socket for an Intel Pentium processor. What type of memory modules wi
    14·1 answer
  • What is an operating system?<br>​
    11·2 answers
  • What are the difference among the whole note, half note and quarter note ? (this is music)
    12·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!